Glendora, California
The parking lot at St Dorothy School in Glendora was badly cracked asphalt with an old chain link perimeter fence. Vancrest provided a 100,000 sq ft concrete parking lot with:
Landscape and irrigation
Water retention and drainage systems
Prefabricated modular concrete perimeter fence with simulated stone and faux finish
Iron fence, concrete columns and automatic gates for security
Electrical outlets for parish carnival power
Kommentit