top of page

St. Dorothy School Parking Lot

Glendora, California


The parking lot at St Dorothy School in Glendora was badly cracked asphalt with an old chain link perimeter fence. Vancrest provided a 100,000 sq ft concrete parking lot with:

  • Landscape and irrigation

  • Water retention and drainage systems

  • Prefabricated modular concrete perimeter fence with simulated stone and faux finish

  • Iron fence, concrete columns and automatic gates for security

Electrical outlets for parish carnival power

bottom of page